New Flat Possession Checklist: Interiors Before You Move In
Getting the keys is exciting. This checklist helps you inspect, plan and finish your interiors in the right order before you move in.

In this article
The weeks between getting possession and moving in go quickly. Doing things in the right order saves money, avoids redoing work and helps you move in on time for your griha pravesh. Tick off each step as you go; this checklist is saved only on your device.
Before possession
At possession: inspect the flat
Before interiors start
During the interiors
Before you move in
How long does it all take?
Most of our projects are delivered in about 35 days after the design and materials are approved. The design stage before that depends mainly on how quickly you review and approve. If you have a griha pravesh date, use the timeline planner on our Our Process page to see when your design needs to be approved.
Frequently asked questions
When should I contact an interior designer for a new flat?
Before possession, if you can. With your floor plan, the 2D and 3D designs can be ready by the time you get the keys.
Should false ceilings be done before painting?
Yes. False ceilings and electrical work come before the final coat of paint, and touch-ups happen after the woodwork is installed.
How long do interiors take after possession?
Most projects are delivered in about 35 days after design and material approval.
What should I check at possession?
Walls, plumbing, electrical points, floor tiles, doors and windows. List defects and have the builder fix them before interiors start.
Plan Your Home With Us
Tell us your locality and home type. We will call you back to fix a time for the site visit.
- +91 86674 38931
- hello@homeinteriordesign.in
- Kompally, Hyderabad · free site visits across Hyderabad